INSTRAN.org | NGO on Transport Issues

  • Indonesian
  • English
Baner

Perlu Kompromi dengan Angkutan Perkotaan

INSTRAN.org – Perpanjangan mass rapid transit (MRT) hingga Tangerang Selatan (Tangsel) harus belajar dengan operasional bus Transjakarta rute Pondok...

MRT Masuk Tangsel Pacu Pengembangan Properti

INSTRAN.org - Wacana moda transportasi massal mass rapid transit (MRT) menembus Kota Tangerang Selatan (Tangsel) dapat memacu pengembangan properti. 

Headtime KRL Bisa Maksimal Jika Semua Perlintasan Sebidang Ditutup

INSTRAN.org - PT KCI terus mencari cara agar headtime Commuter Line bisa dibuat sesingkat mungkin. Salah satu solusinya bahwa headtime commuter line...

Transjakarta Kerahkan 1.300 Armada Bus Saat Pilpres 2019

INSTRAN.org - TransJakarta akan mengerahkan 1.300 armada busnya saat pemilihan presiden (Pilpres) pada Rabu, 17 April 2019.

Hari Ini Mesin Tiket MRT Beroperasi

INSTRAN.org - Vending machine atau mesin tiket otomatis Mass Rapid Transit (MRT) Jakarta akan difungsikan seluruhnya pada hari ini. Operasional mesin...

  • Perlu Kompromi dengan Angkutan Perkotaan

    Senin, 22 April 2019 10:29
  • MRT Masuk Tangsel Pacu Pengembangan Properti

    Senin, 22 April 2019 10:29
  • Headtime KRL Bisa Maksimal Jika Semua Perlintasan Sebidang Ditutup

    Kamis, 18 April 2019 10:37
  • Transjakarta Kerahkan 1.300 Armada Bus Saat Pilpres 2019

    Selasa, 16 April 2019 15:29
  • Hari Ini Mesin Tiket MRT Beroperasi

    Senin, 15 April 2019 11:46

Metropolitan

Perlu Kompromi dengan Angkutan Perkotaan
Senin, 22 April 2019
INSTRAN.org – Perpanjangan mass rapid transit (MRT) hingga Tangerang Selatan (Tangsel) harus belajar dengan operasional bus Transjakarta rute Pondok Cabe-Tanah Abang yang mendapat penolakan keras.  Selanjutnya...
MRT Masuk Tangsel Pacu Pengembangan Properti
Senin, 22 April 2019
INSTRAN.org - Wacana moda transportasi massal mass rapid transit (MRT) menembus Kota Tangerang Selatan (Tangsel) dapat memacu pengembangan properti.  Selanjutnya...
Headtime KRL Bisa Maksimal Jika Semua Perlintasan Sebidang Ditutup
Kamis, 18 April 2019
INSTRAN.org - PT KCI terus mencari cara agar headtime Commuter Line bisa dibuat sesingkat mungkin. Salah satu solusinya bahwa headtime commuter line bisa maksimal jika seluruh perlintasan sebidang... Selanjutnya...
Transjakarta Kerahkan 1.300 Armada Bus Saat Pilpres 2019
Selasa, 16 April 2019
INSTRAN.org - TransJakarta akan mengerahkan 1.300 armada busnya saat pemilihan presiden (Pilpres) pada Rabu, 17 April 2019. Selanjutnya...
Hari Ini Mesin Tiket MRT Beroperasi
Senin, 15 April 2019
INSTRAN.org - Vending machine atau mesin tiket otomatis Mass Rapid Transit (MRT) Jakarta akan difungsikan seluruhnya pada hari ini. Operasional mesin ini dinilai efektif mengurangi antrean calon... Selanjutnya...
Integrating the Busway and the MRT PDF Cetak E-mail
Darmaningtyas, The Jakarta Post | Sat, 09/25/2010 10:53 AM | Opinion
 
Last month national newspapers reported that the MRT might replace the Transjakarta Busway corridor concept. According to a report, the Transportation Ministry proposed discontinuation of the Transjakarta Busway Corridor 1 (Blok M – Kota) in 2015 because it will overlap the MRT Phase 1 (Lebak Bulus-Dukuh Atas) route. This proposal is based on expectations of 200,000 — 300,000 future MRT passengers per day.
Is it really necessary to discontinue the busway service? Further analysis of potential passengers (demand) along Lebak Bulus-Dukuh Atas route is necessary, especially considering that last year vice minister for transportation Bambang Susantono warned that the services of both the busway and the MRT may not persuade commuters to stop using their personal vehicles in favor of public transportation.
  
 
According to a 2008 Instran (Institute for Transportation Studies) survey sample, it was estimated that the number of cars passing the Sudirman — Thamrin area presently covered by the Transjakarta Busway, and by the MRT in the future, will soon reach more than 200,000 vehicles. If each car carries an average of two passengers, this would indicate at least 400,000 potential public transportation users. This number does not include motorcyclists and people who travel by non-busway public transportation.
 
It’s not likely that all private vehicle passengers will become Transjakarta Busway and MRT passengers, but even if 50 percent opted to use the busway and MRT services, there would be a potential demand of 200,000 new passengers.
It is now being suggested that this demand should be met by the MRT alone, at the expense of the Transjakarta Busway, which would no longer be able to provide service to its regular passengers.  “Busway will remain an attractive public transportation alternative if the MRT fares are more expensive.” 

As a result, there could be another public transportation shortage if the Transjakarta Busway Corridor 1 (Blok M-Kota) route is discontinued. Elimination of the Busway Corridor 1 service should be rejected for three reasons. Demand along Lebak Bulus-Kota route is very high and cannot be accommodated by the MRT alone. It is important to re-emphasize the existence of Busway Corridor 1 after the MRT is in operation, especially because initially the MRT plans included plans to improve, not exclude, the corridor.
 
The new proposal comes at a time when the Jakarta administration is working to increase the Busway Corridor 1 load capacity by replacing single carriage busses with articulated busses in 2011, the corridor’s 7th year anniversary, and the end of the existing contract with the corridor’s current operator.
The proposal to discontinue the Corridor 1 service could push the Jakarta administration to reconsider their plans to increase busway capacity.
 
Officials are hesitant to commit to massive investments in articulated busses if the corridor is expected to be closed to make way for the MRT. The need to continue the Busway Corridor 1 service after the MRT needs to be re-emphasized to assure that the government’s investments will not go to waste. Jakarta needs various modes of mass public transportation that are comfortable, safe, punctual and affordable, so that residents have options when deciding to use public transportation.
 
If the government is worried that its mass public transportation endeavors will lack passengers, it needs to better educate the public — especially owners of private vehicles.    Educating the public is an often neglected necessity. In the past, plans to build infrastructure often overlooked public participation and education. The public was regularly unaware of government services and activities being offered, and had little knowledge of the funding behind various projects. This may have been a result of past technocratic dominance over the processes of drafting plans for infrastructure projects.
 
Busway will remain an attractive public transportation alternative if the MRT fares are more expensive. This mode of transportation will attract different market segments based on affordability and destination.  There are passengers who would choose to ride the busway because it is more affordable, and there  are those who will choose the MRT because it fits their travel destinations. Last but not the least, a multi-mode transfer station needs to be constructed so that it will be easier for passengers to switch from the busway to the MRT, and vice versa. Synergy between modes of transportation in many other cities around the world has proven effective in encouraging broader use of mass public transportation.
 
The writer is a transportation observer at the Institute for Transportation Studies (Instrans).

Deli.cio.us    Digg    reddit    Facebook    StumbleUpon    Newsvine
 

Sudah beredar

Baner
Penulis : Darmaningtyas Tebal buku : xxi+344 hal Penerbit : INSTRAN-Pustaka Yashiba Harga : Rp.50.000; Pemesanan via pos ditambah ongkos kirim sesuai ketentuan tarif. Hub: Ratim/Nova, 021-79197057

Pengunjung

mod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_countermod_vvisit_counter
mod_vvisit_counterHari ini937
mod_vvisit_counterKemarin1900
mod_vvisit_counterMinggu ini2837
mod_vvisit_counterBulan ini81126
mod_vvisit_counterSemua5440000
Terima kasih atas kunjungannya

This page require Adobe Flash 9.0 (or higher) plug in.

Download Buku

 

 

 

 

 

 

 

Download

 

 

 

 

 

 

 

Download